Drilling rig URB-2A2 on Ural 4320-61 chassis with two 4VU1-5/9 compressors


Technical characteristics of the URB 2A2 drilling rig

Drilling depth, m
Geophysical wells 100
Structural wells 300
When blowing the face with air 30
When drilling with augers 30
Initial drilling diameter, mm 190
Drilling diameter, mm
When blowing the face with air 135
When drilling with augers 135
Final drilling diameter, mm
Geophysical 118
Structural 93
Rotation speed, rpm
I speed 140
II speed 225
III speed 325
Torque, Nm
I speed 2010
II speed 1210
III speed 830
Rotator stroke, mm. 5200
Working pressure in the hydraulic system, kgf/cm2 100
Tool load capacity, kgf 4600
Loading capacity of the mast, kgf 6000
Overall dimensions in transport position, mm 8080x2500x3500
Overall dimensions in working position, mm 8080x2500x8380
Installation weight, kg no more than 13,800

Drilling rig URB-2A2 on Ural 4320-61 chassis with two 4VU1-5/9 compressors

The main purpose of the URB-2A2 drilling rigs is to drill water intake, blasting, geophysical and exploratory wells, and carry out exploration work for PI deposits.

Using the installation, you can drill using the rotation method:

  1. With flushing.
  2. With purging.
  3. Screw dry.

The installation includes a 4VU1-5/9 compressor, the purpose of which is to provide compressed air (with an excess pressure of 0.78 MPa) to the equipment for carrying out the necessary work.

The installation is based on the Ural 4320-61 chassis, which is driven by the truck’s power unit.

For comfortable and safe work of the driller, a control panel is provided, on which control devices and the necessary regulators are located:

  • Bottom-hole stress.
  • Feed speed.
  • Ascent speed.
  • Rotator spindle speed.

The equipment is automated and equipped with a sensor system that ensures high performance without interruptions when temperatures drop.

URB on the Ural 4320-61 chassis with two 4VU1-5/9 compressors has the following equipment:

  • Electrical equipment;
  • Platform frame with installation;
  • Front support mast;
  • Transfer case;
  • Pulley and Yoke assembled;
  • Lifting cylinders for mast;
  • Hydraulic system piping;
  • New high oil tank;
  • Check valve 1 VU/VUG1X;
  • Ball valve;
  • Diverter;
  • Installation control system in assembled form;
  • Fuel consumption regulator;
  • Assembled mast and carriage;
  • Main and auxiliary roller for carriage;
  • Assembled tackle system;
  • Hydraulic jack;
  • Elevator;
  • Oil seals;
  • Safety valves;
  • Support jacks;
  • Fencing for the drilling rig to improve the safety of workers during drilling;
  • Mudguards;
  • Discharge hoses;
  • Protection system in the form of a double casing;
  • Drilling rig control panel;
  • Other elements.
  • In a drilling rig based on the Ural 4320-61 chassis, the number of revolutions per minute directly depends on the selected speed:

1 speed – 140 rpm;

2 speed – 225 rpm;

3 speed – 325 rpm.

The moment of force also depends on the selected speed. The URB-2A2 dual-compressor drilling rig allows drilling in vertical and horizontal directions at a given angle. Drilling is carried out in several ways - auger, rotary with blowing or flushing. The presence of a control panel in the device guarantees comfortable and safe work for the operator. Advantages include a sensor system and full automation for high performance under all conditions.

Drilling rig URB 2A-2 based on ZIL 131

The URB-2A-2 exploratory drilling rig is designed for drilling geophysical and structural exploration wells for oil and gas using a rotary method with cleaning the bottom of the well by washing, purging or transporting the destroyed rock to the surface with augers. The installation has a moving rotator with a hydraulic drive, which is used in the drilling process, extending the drilling tool without removing it from the bottom and, together with the hydraulic lift, performs the work of lowering and lifting the tool and feeding it during drilling. Drilling is carried out using a rotary method with flushing or purging of the well or augers. The URB 2A2 installation is powered by the car engine. A hydraulically driven rotator moving along the mast is used when drilling, extending the drilling tool without detachment from the bottom and, together with the hydraulic lift, performs the work of lowering (raising) the tool and feeding it during drilling. The rotator moves along the mast using a hydraulic cylinder and a traveling system. The hydraulic mechanism for lowering and lifting and feeding the tool provides optimal feeding force, including when drilling with air hammers, and allows for highly efficient drilling in rocks of any hardness category. The installation control is completely hydraulic and concentrated on the driller's console. The control panel contains control devices and regulators for face force, feed and lifting speeds, as well as rotator spindle speed.

TECHNICAL CHARACTERISTICS OF THE URB 2A2 INSTALLATION:
Conditional drilling depth, m:
— structural exploration wells with flushing 350
— geophysical wells:
with flushing 100
with purging 50
augers 30
Initial diameter of drilling with flushing, mm 190
Final diameter of drilling with flushing, mm:
— structural exploration wells 93
— geophysical wells 118
Drilling diameter with purge, mm 118
Auger drilling diameter, mm 200
Drilling rig rotation frequency, s-1 0,45; 0,7; 1,0; 2,33; 3,75; 5,42
Maximum torque, N*m 2000
Rotator stroke, mm 5150
Rig lifting speed, m/s 0 — 1,25
Overall dimensions in transport position, mm, on the ZIL-131 (Ural) chassis 7850x2500x3300 (8080x2500x3500)
Overall dimensions in working position, mm on the ZIL-131 (Ural) chassis 7850x2500x8200 (8080x2500x8380)
Installation weight, kg, on ZIL-131 chassis (Ural) no more than 10,100 (13,800)

Main characteristics

This model is most often mounted on the ZIL-131 base. This is its standard equipment, which ensures increased maneuverability of the unit and a wide range of applications. The URB 2a2 model can be installed on a tracked or sled base. But this is additional equipment that must be ordered separately. The uninterrupted operation of the unit is ensured by the wheelbase engine. It is not able to function without additional equipment. The URB 2a2 model is completely manufactured using Russian technology from domestic spare parts. This reduces the cost of operating and repairing equipment.

This exploration-type unit can be used for drilling wells up to 300 m deep. It is also used to form channels designed to supply water, which can be used for drinking or technical purposes.

The advantage of the installation is that during operation simultaneous washing or blowing is carried out. At the same time, the drilling process itself does not stop. Also, the process of working with the URB 2a2 model is optimized, since the extension of the drilling tool occurs without separation from the face surface. The pipes are screwed in without additional mechanisms, which is very convenient. For this purpose, the model is equipped with a special rotator.

If drilling is carried out using pneumatic hammers, the optimal operating pressure on the bottom is maintained at all times. This is possible thanks to a hydraulic cylinder. This mechanism provides feeding, raising and lowering of the working tool.

Drilling rig URB 2A2 based on Zil chassis

Drilling rig URB-2A-2

To all products of the group “Drilling Rigs - Heavy Series”

mining equipment drilling rig special equipment automobile transport machinery and equipment

The URB 2A2 drilling rig is designed for exploration drilling. It is worth noting that this particular installation has long become legendary among drillers and is in demand among consumers around the world. Engineering surveys, searching for minerals and water horizons, drilling for construction purposes - she can do everything. The installation can operate either as a continuous face using the roller cutter, auger or pneumatic impact method, or as an annular face using the core method. It works with a rotary type chisel, however, if desired, you can connect an auger unit. When auger drilling is used for not very great depths - 30-50 meters, the maximum depth of a structural exploration well drilled by such an installation is 300-350 meters, geophysical wells with flushing 100 meters, and geophysical wells with flushing 30-50m

Drilling rig URB 2A2: what are the advantages?

Drilling rigs URB 2A2 are simple and easy to use. The well is drilled using a rotary method, and it can be washed with a special solution or blown with air. The installation is mainly mounted on wheeled chassis “Ural 6x6”, “KAMAZ 6x6” or “ZIL-131”, as well as all-terrain chassis of the corresponding load-carrying capacity; its “heart” is the engine of the chassis on which it is installed. Hydraulic control greatly facilitates the work of operating personnel. The operator monitors the operation of the drilling rig according to the readings of control instruments, and controls it using regulators of the force of the lifting speed, rotation speed and bottom hole. Buying a UBR 2A2 means getting a universal drilling rig for performing a very wide range of work in drillability rocks of almost any category. Construction, water well drilling, engineering and geological research - it is the ideal solution for any task. Moreover, it can be installed on a four-wheel drive or sled chassis - it is simple and autonomous. Great demand gives rise to an equally considerable supply - services provided using the 2A2 URB drilling rig are becoming increasingly popular. It has been and remains a leader among Russian drillers in its class, thanks to its operational efficiency for more than half a century. This drilling rig has proven itself well even in the conditions of the Far North, as it is capable of operating on a tracked basis and even from a watercraft (drilling rig on a pontoon). This, as you yourself understand, is not something that every analogue can boast of.

Operating principle of the drilling rig

Let us consider in a simplified mode the operating principle of this installation. The drilling rig is driven by the chassis engine, then through the power take-off box installed on the chassis, mechanical energy enters the transfer case, two hydraulic elements (motor pumps) are installed directly on the transfer case, converting mechanical energy into hydraulic energy, one motor pump generates hydraulic energy energy for all hydraulic cylinders and provides hydraulics: mast lift cylinder, support cylinders, rotator lift and lower cylinder. The second pump motor provides hydraulics to the drilling rig rotator. A counter hydraulic element (pump-motor) is installed on the rotator, converting hydraulic energy back into mechanical energy. It is the rotator that transmits all the rotation to the drill string. A specialized competitive environment and reasonable customer requirements for drilling rigs, while maintaining low cost, helps to improve and modernize the design of the drilling rig. Our company offers you optimal and economically balanced solutions. And the use of the ISO 9001-2008 quality management system allows our company to release high quality products and unique service technology to the market.

What do we offer to our partners?

The Drilling Technologies Plant offers the best options for purchasing a URB 2A2 drilling rig at a low cost. Qualified personnel and a powerful production base are the two pillars on which the production of impeccable quality products rests. Technological solutions are applied individually - depending on your requirements. We offer:

  • Selection of drilling equipment that is ideal for your conditions. The assortment is large, so it’s easy to get lost. But turning to real professionals will solve all doubts about the choice.
  • Design and production of drilling equipment, development of functions that are important in this particular case.
  • Adaptation of equipment to working conditions.
  • Manufacturing of a drilling rig according to technical specifications. Development of technical specifications together with your specialists
  • Complete with any drilling tool.

Our team is constantly developing new modern models that make working easier and more efficient. We are able to provide all Russian companies that are engaged in drilling wells with excellent quality equipment at the best prices for URB 2a2. Moreover, everyone who purchased a URB 2A drilling rig or any other model from us receives high-quality service. It doesn’t matter where exactly the drilling work is carried out - in the capital or in the Far East - if necessary, our personnel will carry out repairs or prevent “emergency situations” at work. Our business partners are located all over the world - Russia, CIS countries, Italy, Germany, Holland, China, Africa, Canada, etc. - working with them has given us a lot of experience, so our developments are highly effective. The equipment works with full efficiency, and breakdowns occur so rarely and are fixed so quickly that there is practically no downtime for clients.

10 reasons why our partners choose drilling rigs manufactured by Drilling Technologies Plant:

  • By choosing the URB-2A-2 drilling rig produced on the production line of the Drilling Technologies Plant, you can be sure that you are investing in a high-quality and reliable product that will solve your problem and bring the planned profit!
  • We run in and test 100% of transfer cases and rotators, as well as hydraulic elements. The remaining elements of URB-2A-2 undergo careful quality control. After assembly, your drilling rig undergoes regulated field tests at the test site.
  • To work with the customer as efficiently as possible, the selection of equipment and materials is made taking into account all your wishes.
  • We offer a unique service. Supervised installation of drilling rigs in your city is necessarily accompanied by a visit from our specialist to the place of permanent operation of the drilling rig. Installation is carried out by our specialists with the participation of your technical staff of your company. Providing this service is relevant for companies remote from St. Petersburg, and also gives you a unique opportunity to see and take part in the work on your installation. With the help of our specialists, we will train your employees.
  • We provide warranty and post-warranty service, including an on-site team.
  • The nomenclature and minimum terms give you the opportunity to carry out repair and maintenance work on your equipment in a timely and planned manner
  • For regular customers there is a cumulative discount system.
  • We work not only with Russia, but also with all countries of the near and far abroad.
  • Our drilling rigs are used for all types of drilling operations, which allows you to use drilling rigs in various industries.
  • Incoming quality control of supplied raw materials used in production.

The standard package of the URB-2A-2 drilling rig includes:

  • Reinforced mast. The strength characteristics for bending and torsion have been increased by 1.7 times compared to the standard design, and the structural properties of the platform have been improved.
  • Gearboxes with increased service life, thanks to a new assembly and running-in system on test benches.
  • RVD (packed in plastic protection).
  • The hydraulic system uses valves made in Italy and Portugal, which significantly increases the reliability of the hydraulic system
  • If necessary, a system for supplying flushing/blowdown to the rotator seal through a manifold with high-pressure taps installed on the mast. To provide on-line flow control and reset capabilities.
  • The oil filtration system is implemented on a low pressure line. Italian-made filters with a contamination sensor are installed, this allows you to avoid emergency situations when starting up in low temperature conditions.
  • Fencing around the perimeter of the platform for easy transportation of drilling equipment. Also, for ease of transportation of drilling equipment, the oil tank is located on a special frame, which allows transportation of drilling equipment up to 5 m long.

Main technical characteristics of the URB-2A-2 drilling rig

Drilling depth, m
Geophysical wells100
Structural wells300
When blowing the face with air30
When drilling with augers30
Initial drilling diameter, mm190
Final drilling diameter, mm
Geophysical118
Structural93
Drilling diameter, mm
When blowing the face with air135
When drilling with augers135
Rotation speed, rpm
I speed140
II speed225
III speed325
Torque, Nm
I speed2010
II speed1210
III speed830
Rotator stroke, mm.5200
Working pressure in the hydraulic system, kgf/cm2100
Tool load capacity, kgf4600
Loading capacity of the mast, kgf6000
Overall dimensions in transport position, mm8080x2500x3500
Overall dimensions in working position, mm8080x2500x8380
Installation weight, kgno more than 13,800

“Construction of the Moscow – St. Petersburg expressway on the section km. 58 – km. 684 (with subsequent operation on a toll basis).

Object name“Construction of the Moscow – St. Petersburg expressway on the section km. 58 – km. 684 (with subsequent operation on a toll basis).
LocationNovgorod region - Novgorod, Okulovsky and Malovishersky districts km 457 - km 461
CustomerJSC "TRANSSTROYMEKHANIZATION"
Design stageWorking documentation
Reconstruction, newNew construction
Characteristics of the designed objectsTotal length of the route: km 479 – km 525, 46 km; km 457 – km 461 4 km
Level of responsibility of structuresII – normal level of responsibility.
Category of complexity of engineering and geological conditions (in accordance with Table B SNiP 11-105-97)III – complex

The projected site is administratively located in the Russian Federation, the SPAD route passes through the Novgorod region - Novgorod, Okulovsky and Malovishersky districts (km 457, km 461, km 479 - km 525). Well drilling here is carried out using URB-2-A2 drilling rigs on a KAMAZ vehicle and URB-2-A2 on an MTLB, in short trips, with sampling of damaged structure and monoliths in accordance with GOST 12071-2000 to determine the full range of physical properties and corrosion activity soils. Wells are drilled using core and auger methods, with core sampling. When drilling wells, a detailed description of the section being opened is carried out, the appearance of groundwater and its established level are recorded. In addition, photographic recording of drilling sites is being carried out with location reference. In particular, at PC 5197+48 (the nearest settlement of the village of Mytno, Leningrad Region), bridge crossings are being designed across the Zadny stream and the Lisitsyn stream, respectively. These are places where small artificial structures are installed. As of September 11, 2014 the future highway in this section looks like this: After visiting the site, it was proposed to equip all wheeled drilling rigs with special tracks


Wheeled vehicles in such conditions are most effective with “Tracks for Wheeled Vehicles.” Drilling in this area is carried out using a URB-2A-2 drilling rig on a KAMAZ vehicle. Drilling rig URB-2-A2 complete with: Rotator-2000Nm, Pump NB-32, Compressor-4VU, Supply tank heated from vehicle exhaust gases.


And at the site PK 5348+40 (the nearest settlement of the village of Sitno, Novgorod region) the situation is more clear. As of September 11, 2014 The future expressway in this section looks like this:


Engineering-geological surveys of sites for constructing artificial structures consist of excavation of geological workings in the areas of intended structures and conducting field studies of soils, if necessary. Drilling in this area is carried out using a URB-2A-2 drilling rig on an MTLB chassis. Drilling rig URB-2-A2 complete with: Rotator-2000 Nm, Pump DYNASET HPW 90/150-85, water tank To determine the steady level, the wells are gelled until the water is completely clarified. After completion of the work, the wells are eliminated by backfilling the soil with compaction, and fixing the location of the wells with a pole, with the drawing up of a report for liquidation plugging. When drilling, lithological differences are identified, aquifers are separated, and groundwater levels are established.

Construction of a mining and processing plant on the basis of the Oleniy Ruchey apatite-nephilite ore deposit. Section “External railway transport”, construction of a new non-public access road from the Titan station of JSC Russian Railways to the Oleniy Ruchey station of NWPC CJSC.

And others:

Our installations were highly appreciated by:

LLC "Interregional Consulting Center"
NPP BENTA
JSC "MurmanskTISIS"
Atlant LLC
LLC "NPK "GeoPolymer"
LLC "StroyEnergoTechnology"
Lotus Geo LLC
JSC Lengiprotrans
CJSC "Sberbank Leasing"
JSC "Gipsopolymer"
LLC "GazRegionLeasing"
JSC "LENMORNIIPROEKT"
Geozond LLC
LLC "YarKamp"
Unix Engineering LLC
LLC "MiIGeology"
LLC "IFK "Avangard"
LLC "UralNefteGazStroy"
JSC "Europlan"
LLC Transport Leasing EXPO-Leasing
LLC "Bursnab"
OJSC Severstal
JSC "Antikor"
LLC "Design and Survey Institute "Promtransproekt"
Geopromstroy LLC
Promburvod LLC
ProfOtsenka LLC
LLC "Variant"
Astra LLC
OJSC PI "Tambovgrazhdanproekt"
LLC SGP "Etrek"-M"
EGP Group LLC
PetroBurService LLC
LLC "GazRegionLeasing"
LLC "SAI-project"
LLC "ALARIS"
Geo-Project LLC
Amber Plus LLC
PermProjectIzyskaniya LLC
LLC "UralStroyGarant"
LLC "I.L.S."
DOJSC "Electrogaz" OJSC "Gazprom"
GeoTechnoService LLC
Izyskatel LLC
LLC "INVESTPROEKT"
OJSC "Vorkutaugol"
Avtodorspetstekhnika LLC
GeoStroyProekt LLC
DOJSC "Electrogaz" OJSC "Gazprom"
LLC "Geological Exploration Equipment"
LLC "Northern Leasing Laboratory for Searching Underground Utilities"
LLC "TFI-VODATSESS"
Internika LLC
LLC Nevskaya Burovaya Yuzhnouralsk Leasing Center
OJSC "Roszheldorproekt"
LLC "Engineering
GeoService LLC
LLC "Vodorezerv"
LLC "Teplomontazhizolyatsiya"
CJSC "Alliance-Leasing"
LLC PSK "KhimPromProekt"
As well as more than a hundred other companies throughout the Russian Federation and the CIS countries. We are waiting for you, represented by our business partners.
URB-2A-2URB-12.ZBT
Name of parametersChassis typeChassis type
KamAZ 5350KamAZ 5350
Rotator type2A2D2A2DScrew
Drilling rod rotation speed, rpm
1 speed135651356540
2 speed21010021010068
3 speed30015030015080
Torque, maximum, Nm
Dependence of torque on the number of revolutionsThe maximum torque in a particular gear develops at the maximum speed of that gear.Maximum torque in a specific gear, can be realized over the entire speed range of that gear
1 speed20904570209045705000
2 speed13302840133028402800
3 speed940197094019702000
Drilling depth, m
By core method100100100100120
Shock rope methodNONO404040
In a sharp way300350300350350
By screw method3050305080
Initial drilling diameter, mm190250190250360
Final drilling diameter, mm
core/cone projectile9393
shock rope projectileNO89
Auger projectile135135135135
Permissible axial load on the elevator, t (no more)55
Carriage stroke, mm (no more)52005200
Rotator driveaxial piston hydraulic motoraxial piston hydraulic motor
Rotator carriagemoves along the mast without shifting from the drilling axismoves along the mast has a hydraulic shift from the drilling axis to implement the shock-rope drilling method
Rotator carriage rollersfour rollers moving along the internal profile of the mastEight eccentric rollers moving along the internal profile of the mast
Working pressure in the hydraulic system, kgf/cm2100rotator line 300 other lines 100
Mechanism for lowering and lifting and feeding toolshydraulic with pulley blockhydraulic with pulley block
Force created on the tool, kN
when fed to slaughter2828
when lifting the tool4848
Tool lifting speed, m/s0…1,20…1,2
Tool feed speed, m/s0…1,10…1,1
Mast typewelded structurewelded structure, mast reinforced with truss structure
Loading capacity of the mast, kN (no more)6060
Drill pipes
diameter, mm6363
length, mm47004700
Casing pipes
diameter, mm168168
Dynamic sensing device(OPTION)
UDZ-60NOMedium type, 60 kg.
Winch for SPO, with free dischargeNO
LBS-250
2500
40
14
hydraulic
8500
Casing lifting device (OPTIONAL)NO
149(15000)
69(7000)
200
63…168
Implementation of static sensing stationary (OPTION)NOHYSON 100 kN LW stroke 700
10t.
12.7t
2cm/s
1.58cm/s
Implementation of static sensing mounted (OPTIONAL)pressing with a rotatorpressing with a rotator
maximum indentation force subject to anchoring2.8t2.8t
maximum lifting force4.8t4.8t
Dynamic sensing deviceNOUDZ 60
Hydraulic clamp(OPTIONAL)63mm-168mm63mm-168mm
Additional equipment (OPTIONAL)PumpCompressorPumpCompressor
Other according to technical specificationsOther according to technical specifications
Dimensions
Power consumption, kW (no more)4444
Overall dimensions in transport position, mm
length87008800
width25002500
height38503980
Overall dimensions in working position, mm
length85008500
width25002500
height84008827
Curb weight of the product, kg (no more)*1430014300
Permissible total weight, kg (no more)1542015420
Distribution of the total mass of the installation on the road, kg
through the front axle54905490
through the rear axle99309930
Maximum travel speed, km/h8080
  • March 22, 2021
  • 21 views
  • Share
  • About the manufacturer
  • Message to the manufacturer

21 views since March 22, 2022

Rating
( 2 ratings, average 4 out of 5 )
Did you like the article? Share with friends:
For any suggestions regarding the site: [email protected]
Для любых предложений по сайту: [email protected]